Showing posts with label Basement. Show all posts
Showing posts with label Basement. Show all posts

Tuesday, September 3, 2013

Oh, hi there!

It's been a while! I didn't mean to, but I ended up taking the summer off from blogging. I also took the summer off from knitting, and schooling my kids. I helped our contractor in the basement, and schlepped the kids to summer sports, and not much else got done. It was a busy summer.

Today is our first day of school. So here's our "back to school" picture...
Yep, we were just getting ready to read our Bibles together. Angel is now in seventh grade, Princess is in fourth, and Kitty is in first. Today was a pretty light day as far as schoolwork was concerned; we had some errands to run in town.

But anyway, about summer... we got the bedrooms and bathroom done, and the man-cave is nearing completion.
Kitty's room

Princess's room

The girls' bathroom
Sorry, I don't have a good photo yet of Angel's room. I was all set to take one, and then we had a natural disaster. The basement flooded. Most of the water came in through Angel's window, and we had to empty her room and pull up her carpet. We got the carpet cleaned and put back down, but then it was time to head out of town for two weeks to visit my family in Kansas. Which was awesome. So anyway, don't let me forget to post a photo of her room soon.

I've continued (very slowly) to lose weight. Here I am wearing a knitted pencil skirt that I finished while in Kansas. It took me about two weeks to knit. I've already started another one...
I still have about 25 pounds to go to reach my goal weight. I'm planning on doing that before the end of the year. I want to start 2014 NOT thinking about my weight. 

So yeah... I'm hoping to find more time to blog now that summer is officially over. And more time to knit...

Sunday, June 16, 2013

Basement-in-progress

We're finishing our basement. And by we, I mean the contractor and I. :) Three weeks ago, it was one big, open space, with the stairway basically cutting it in half. Now, we have framed three bedrooms, a bathroom, a utility room, a photo studio, and a half-bathroom. Electrical and plumbing work is almost done, and drywall is up in most of the rooms. The contractor started mudding the drywall on Friday. We haven't started yet on the man-cave part of the project; we're trying to get the girl-country side done, so we can move the kids downstairs.

I've learned a lot so far. I've done some framing before, but with this project we had to make the framing fit around the existing ductwork, so that was a challenge. And I got to set all the walls, which meant drilling down into the concrete, and using special bolts to secure the framing to the floor. I didn't do any of the plumbing myself, but I watched. I did do some of the electrical! I pulled wires, and attached them to junction boxes, and on Friday I wired a bunch of electrical outlets. Don't worry, none of those wires were hooked up to breakers yet. Drywall is not as easy as it looks, but it's also not complicated. I haven't done any of the mudding, yet; I've just watched. There's something about mudding.... ever since I was a little girl, I've found it mesmerizing. I liked to watch my dad when he finished the basement in our home, when I was about 10. Maybe I'll give it a try on Monday...

My hands are not happy about all this contruction work; they're very rough, and all my nails are broken. But oh, well. Nails grow back, and I'll pamper my hands when this is all over. I haven't knit a stitch in three weeks, partly because I've just been too busy, and partly because I don't want to snag the yarn with my rough, dry skin.

I'll post photos when I have some; I've been so busy working that I haven't been documenting the process with my camera.